PORTFOLIO

PROJECT ONE - MINING OPERATIONS – CENTRAL QLD

Supply of full survey teams to run and manage production, progress and planning surveys. Provide ongoing set out and support for monthly reporting on quantities and targets. Execution and master update of mine models. Create statutory mine plans to meet regulations, life of mine and exploration surveys.
CLIENTS: GLENCORE, RIO TINTO, THEISS, LEIGHTONS, WESFARMERS, YANCOAL

PROJECT TWO - GLADSTONE AIRPORT UPGRADE 2008 – 2010

Gladstone Airport expansion – lengthening and widening runway, new taxiways and aprons, improve site drainage and upgrade the lighting system, whilst airport remained operational.
CLIENT: GOLDING CONTRACTORS
OVERALL PROJECT COST: AUD$64 MILLION

PROJECT THREE - ROLLESTON VILLAGE EXPANSION

Challenging placement of 350 new units adjacent to an existing mine camp. Each unit had to fit exactly onto in-situ cast piers with a very tight tolerance for bolt locations. Maintained accurate, up to date, as-built records to comply with mine safety regulations.
CLIENT: GLENCORE

PROJECT FOUR - GREGORY HIGHWAY RECONSTRUCTION

As a result of major flooding across Queensland during 2010 and 2011, significant damage was inflicted on the central highlands road network, particularly between Emerald and Clermont.
MPA Surveying conducted 102km of road alignment plus construction of drainage systems. Bridges and machine control for the 45+ million dollar project.
CLIENT: CMC GROUP

PROJECT FIVE - BMA HAY POINT EXPANSION 3

Auditing surveyors for the EPCM for all marine and onshore works for the expansion. Installation of all prefabricated mega structures.
CLIENT: BHP BILLITON MITSUBISHI ALLIANCE (BMA)
OVERALL PROJECT COST: AUD~$3 BILLION
OVER 12000 INCIDENT FREE SURVEY MANHOURS WORKED THUS FAR

PROJECT SIX - GLADSTONE LNG PLANT PROJECTS

Construction, assembly and set out of all train structures and modules for liquification of natural gas. Pipeline construction services plus structural features and tanks for the APLNG and GQCLNG networks.
CLIENT: BECHTEL
PROJECT DURATION: 3 YEARS (2012–2015) ONGOING

PROJECT SEVEN - FORGAN BRIDGE – MACKAY

This project required full duplication and replacement of the existing Forgan Smith Bridge, Barnes Creek Bridge plus 3km of arterial roads. Our full time survey crews executed a full suite of engineering services, marine piling, bridge construction and modelling. The project ran over a three year duration between 2008 and 2011, and cost the Department of Transport and Main Roads a total of $170m.
 
CLIENT: GOLDING CONTRACTORS

PROJECT EIGHT - DBCT RL3 STACKER RECLAIMER

This project involved full assembly of the RL3 Stacker Reclaimer. Our team was required to perform high precision pre-assembly survey measurements of the components to be installed and assembled, as well as provide plans, drawings and QA documentation in order for assembly tolerances to be checked, confirmed and approved. Precise set out of machine parts was key to enabling heavy lift pin offs to be carried out accurately.
 
CLIENT: GOODLINE